Let us get your console ready
Four short steps. If you ordered through the Advisor, the site and cameras are already here.
The same account as the IndoAI mobile app. Operators use the number on their invite.
Four short steps. If you ordered through the Advisor, the site and cameras are already here.
A good week across the three live sites: 42 incidents, nine fewer than last week, 93 percent closed inside SLA. PPE events fell at Chakan after the Dock 3 zone was redrawn. Both escalations were on the Chakan night shift between 02:00 and 03:00. Kothrud goes live on Saturday.
Quiet night so far. One intrusion alert at the store room at 02:14 is still unassigned and 12 minutes past its SLA. Two PPE events at Dock 3 were closed by Suresh. Perimeter W-2 has been offline since 04:12; the switch port shows no link. Storage on IPC-01 falls below 14 days on 18 November unless perimeter cameras move to events-only recording.
| Incident | Camera | Zone | Time | Owner | SLA | Status | |
|---|---|---|---|---|---|---|---|
Intrusion, store room INC-2411 | Store room Intrusion Guard | Store room | 02:14 | Unassigned | +00:12 | Open | |
PPE, no helmet INC-2410 | Dock 3 PPE Sentinel | Docks | 06:12 | SP Suresh P. | 01:40 | Assigned | |
Vehicle at fire exit INC-2412 | Parking S Intrusion Guard | Parking | 06:31 | IS Imran S. | 03:29 | Assigned | |
Forklift over speed INC-2409 | Aisle B Forklift Safety | Aisles | 05:48 | SP Suresh P. | Closed in 10 min | Warning issued | |
Loitering at Gate 1 INC-2408 | Gate 1, wide Loitering Alert | Gate | 23:40 | IS Imran S. | Closed in 4 min | False positive | |
Smoke suspected INC-2407 | Battery bay Fire and Smoke | Battery bay | 21:08 | SP Suresh P. | Closed in 6 min | Resolved on site |
| Camera | Status |
|---|---|
Store room Store room zone, Intrusion Guard | Incident |
Perimeter W-2 Perimeter, Intrusion Guard | Offline |
Dock 3 Docks, PPE, Forklift, Fire | Online |
Gate 1, ANPR Gate, ANPR Pro | Online |
Aisle B Aisles, Forklift Safety | Online |
Battery bay Battery bay, Fire and Smoke | Online |
A person entered the store room through the back door at 02:14:08, three hours after closing, stayed six minutes near the high-value rack and left the same way at 02:20:12. No vehicle at the back gate in the ten minutes either side. Face not captured: the back door camera looks down at 40 degrees.
| Clip | Incident | Range | Hash | Custody | Shared | |
|---|---|---|---|---|---|---|
Store room Exported by Meera K., today 06:20 | INC-2411 | 02:13:40 to 02:20:12 | 9f3a ... c41e | Sealed, verified | Not shared | |
Dock 3 Watermarked 720p | INC-2410 | 06:11:50 to 06:13:10 | 1c88 ... 0a7d | Sealed | Suresh P., opened 2 times | |
Gate 1, wide Shared with Chakan police station | INC-2388 | 23:02:10 to 23:05:40, 28 Oct | 7be1 ... 44f2 | Sealed | Link expired 31 Oct | |
Aisle B Forklift over speed | INC-2409 | 05:47:30 to 05:49:00 | a0d4 ... 91c3 | Sealed | Not shared | |
Battery bay Smoke suspected, false positive | INC-2407 | 21:08:10 to 21:11:00 | c5e9 ... 2b61 | Legal hold | Insurer, opened 1 time |
| Camera | Zone | Mode | Keep for | Pre and post event | Cloud sync | Daily size | Schedule |
|---|---|---|---|---|---|---|---|
Dock 3 6 MP, 15 fps | Docks | 30 days | 15 s, 45 s | 2.1 GB | 06:00 to 22:00 continuous | ||
Gate 1, ANPR Motorised, 15 fps | Gate | 45 days | 10 s, 30 s | 3.0 GB | Always | ||
Aisle B 6 MP, 15 fps | Aisles | 30 days | 15 s, 45 s | 2.0 GB | 06:00 to 22:00 continuous | ||
Perimeter W-2 6 MP, 12 fps | Perimeter | 30 days | 15 s, 60 s | 0.4 GB | Events only, armed 22:00 to 06:00 | ||
Battery bay 8 MP, 12 fps | Battery bay | 30 days | 15 s, 45 s | 2.8 GB | Always | ||
Store room 4 MP, 12 fps | Store room | 60 days | 15 s, 60 s | 1.2 GB | Always |
| Device | Address | Health | Streams | AI models | Signal | Status | |
|---|---|---|---|---|---|---|---|
IPC-01, Industrial PC RTX 4000 Ada, IndoAI Node 4.2.1 | 10.20.4.2 | GPU 62%, 28 streams, storage 21 d | 28 | 6 models | Online | ||
Gate 1, ANPR Motorised bullet, 4 MP | 10.20.4.31 | 15 fps, 3.1 Mbps | ANPR Pro, Intrusion | Online | |||
Dock 3 6 MP AI bullet | 10.20.4.33 | 15 fps, 1.9 Mbps | PPE, Forklift, Fire | Online | |||
Battery bay 8 MP dome | 10.20.4.40 | 12 fps, 2.8 Mbps | Fire and Smoke | Online | |||
Perimeter W-2 6 MP bullet, via DS-7732 channel 27 | 10.20.4.47 | No link on port 14 since 04:12 | Intrusion Guard | Offline | |||
Hikvision DS-7732, recorder 32 channels, 28 in use, passes streams to IPC-01 | 10.20.4.10 | Local retention 30 d | 28 | Online | |||
PoE switch, 24 port 82 W of 250 W used. Port 14 no link | 10.20.4.3 | 23 ports up | Degraded |
| Model | Cameras | Events, 7 d | Precision | False alerts a day | Tier | Status | |
|---|---|---|---|---|---|---|---|
| PPE Sentinel 3.2, IndoAI | 12 | 1,240 | 96% | 0.4 | Verified | Active | |
| Fire and Smoke Watch 2.1, IndoAI | 28 | 2 | 98% | 0.1 | Verified | Active | |
| Forklift Safety Monitor 1.8, IndoAI | 6 | 38 | 94% | 0.3 | Verified | Active | |
| Intrusion Guard 2.4, IndoAI | 8 | 11 | 97% | 0.2 | Verified | Active | |
| ANPR Pro 4.0, IndoAI | 1 | 418 | 99% | 0.0 | Verified | Active | |
| Loitering Alert 1.2, IndoAI | 2 | 3 | 91% | 0.5 | Verified | Trial | |
| Crowd Density Estimator 2.0, Sahyadri Vision | 0 | Verified | Passes on 9 cameras |
| Request | Sites | Requested by | Status | Next step |
|---|---|---|---|---|
| Pallet stacking height | Chakan DC | Meera K., 20 Sep | Validating | Your sign-off on the test report |
| Truck dwell at docks | Chakan DC | Rohan D., 2 Aug | Active | Quarterly accuracy review |
| Shelf gap detection | Baner, Wakad | Nitin S., 28 Oct | Collecting footage | Two weeks of aisle clips |
| Person | Zone | Violations | Last |
|---|---|---|---|
| R Worker 0417 | Dock 3 | 9 | Today 06:12 |
| K Worker 0233 | Aisle B | 6 | Yesterday |
| M Worker 0871 | Dock 1 | 5 | Mon |
| A Contractor, Sai | Battery bay | 4 | Sun |
| D Worker 0109 | Dock 4 | 4 | Sat |
| Report | Scope | Schedule | Recipients | Latest | |
|---|---|---|---|---|---|
Weekly outcome Incidents, closure, ownership, outcomes | Chakan DC | Monday 06:00 | Meera K., Rohan D., Suresh P. | Ready, 26 Oct to 1 Nov | |
PPE compliance By zone and shift | All sites | Daily 18:00 | Meera K. | Ready | |
Device uptime Per camera, monthly | All sites | 1st of the month | Meera K. | Ready | |
Evidence audit Who viewed, exported and shared | All sites | Monthly | Rohan D. | Ready | |
Attendance Face recognition at Gate 1 | Chakan DC | Daily | Needs Visitor Recognition | ||
Footfall Entries, dwell, conversion | Baner, Wakad | Weekly | Nitin S. | Ready |
A good week. 42 incidents, nine fewer than last week, and 93 percent closed inside SLA. PPE events fell after the Dock 3 zone was redrawn on Tuesday. Two escalations reached Admin, both on the night shift between 02:00 and 03:00, which is where cover is thinnest. Storage on IPC-01 will need a decision before 18 November.
| Type | Count | vs last week |
|---|---|---|
| PPE | 24 | down 9 |
| Forklift speed | 8 | same |
| Intrusion | 4 | up 2 |
| Loitering | 3 | trial |
| Fire and smoke | 2 | both false positive |
| Vehicle | 1 |
| Name | Role | Sites | On shift | Last active | Status | |
|---|---|---|---|---|---|---|
| MK Meera Kulkarni meera@freshbasket.in | Admin | All sites | Now | Active | ||
| RD Rohan Deshmukh rohan@freshbasket.in, CFO | Admin | All sites | Yesterday | Active | ||
| SP Suresh Pawar +91 98xxx 11223 | Operator | Chakan DC | Night, until 06:00 | 2 min ago | Active | |
| IS Imran Shaikh +91 98xxx 44110 | Operator | Chakan DC | Night, until 06:00 | 14 min ago | Active | |
| NS Nitin Sawant nitin@freshbasket.in | Operator | Baner, Wakad, Kothrud | Today | Active | ||
| SE Sai Enterprises Installer | Temporary | Kothrud until 10 Nov | Today | Active |
A person entered the store room through the back door at 02:14:08, three hours after closing. They stayed six minutes near the high-value rack, handled items on the second shelf, and left the same way at 02:20:12. No vehicle was seen at the back gate. Face not captured: the back door camera looks down at 40 degrees.